for Dynamic Balancing of Production Line in Workshop
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Focusing on the deficiencies in production line balancing of present methods, a new method named production line's dynamic balancing method, which combined heuristic method and visualization simulation together, was proposed. In this method, a double-objective model of line balancing was built up, which ensures the number of workstations and the smoothness index are both minimum. Then an improved particle swarm optimization algorithm was used to solve the problem. The production line system is suitable to build its visualization simulation model by the simulation software of Witness. At last, an instance of this method was discussed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code